Light Rail Manila Corporation
Since assuming operations and maintenance functions in 2015, Light Rail Manila Corporation has invested ₱11.6 billion for the rehabilitation, restoration, and upgrade of LRT line 1, resulting in a more comfortable, safer, and reliable commute for its 450,000 average daily passengers before the COVID-19 pandemic.
With 116 working light rail vehicles at present (from 77 in 2015), LRMC provided the public with more trips per day, expanded operating hours, and shortened headway from a 5-minute average interval in 2015 to the
current 3.5-minute average. Various renovation, re-layout, and accessibility improvement works have likewise been implemented to improve passenger safety and operational efficiency. In 2020, LRT-1 operations were suspended for three months when Metro Manila was placed under ECQ. During this period, preventive and corrective maintenance works for the line were undertaken to ensure improved service when operations resume.
LRT-1 resumed operations on June 1, 2020 under the General Community Quarantine period at 12% allowed passenger capacity. This was increased to 30% in October 2020 in support of the gradual reopening of the country’s economy. LRMC strictly observes and implements above-minimum health and safety measures to ensure passenger and employee safety on a continuing basis.
The pandemic also accelerated the company’s plans on digitalization and innovation. LRMC’s Automated Train Operations Management Systems enabled the company to efficiently manage its resources. This led to more scheduled trips, shorter queuing time, and faster rides.
LRMC also introduced two new features for its ikotMNL mobile app to address the pressing needs of the commuters: 1) contact tracing via Bluetooth LE technology, and 2) integration with Sakay.ph app for better planning and commute directions
Project completion for LRMC’s Cavite Extension project reached 48% by end of 2020. With an investment of ₱13.2 billion , the project will add eight new stations to the existing line. LRMC welcome the arrival of the new Generation 4 train sets in January 2021 and is preparing to utilize it on the existing line.